U.S. developers deployed 6.4 GW of new clean power capacity in the first quarter of 2026.听Cumulative听clean power capacity across the US hit 370 GW, enough to power听nearly 80听million homes.听听

The Q1 2026 Clean Power Market Report听showcases听steady development in the solar and storage sectors, while the pipeline for wind projects has slowed, due to ongoing federal听pushback听and delays.听听

The pipeline for clean power projects rose by 6% compared to Q1 2025, driven primarily by a 13% growth in the solar pipeline and 8% growth in the battery storage pipeline. In contrast, the pipeline for land-based wind has stagnated, and offshore wind has plummeted by 35%. Early-and-mid-stage land-based wind projects have struggled to secure approvals from federal regulators, and offshore wind continues to weather听permitting听roadblocks and uncertainty.听

Report Highlights听

  • Capacity Continues to Climb:听Cumulative clean power capacity hit 370 GW in Q1 2026, enough to power听nearly 80听million homes.听听听
  • Pipeline in Flux:听The pipeline for clean power projects rose by 6% compared to Q1 2025, driven primarily by a 13% growth in the solar pipeline and 8% growth in the battery storage pipeline.听Due to ongoing federal delays, the pipeline for land-based wind has stagnated, and offshore wind has plummeted by 35%.
  • Solar Shines:听More than 3.6 GW of utility-scale solar capacity began operations in the first quarter, pushing cumulative operating capacity to 161.1 GW, enough to power 590,000 homes.
  • A Slow Quarter for Capacity Installations:听Year-over-year, overall clean energy quarterly capacity installations were down by 17%, compared to the 7,695 MW of capacity energized in Q1 2025. Q1 installations also fell by 66% compared to Q4 2025, which can听generally be听expected as first quarters are typically much slower than fourth quarters.
  • Delays Add Up:听Over 6.4 GW of clean power capacity initially expected to become operational during Q1 were delayed, adding to the 53 GW backlog of delayed projects. Project developers often attribute project delays to lengthy permitting schemes, backlogged interconnection queues, and fluctuating prices for key project equipment.听
  • Texas Continues to Dominate: With over 96.4 GW of clean power projects in operation, Texas is on the verge of becoming the first state to cross the 100 GW threshold. Texas is home to 26% of online capacity in the U.S. and has more operational capacity than the next four states combined.听

Read the Report:

Download the complete Q1 2026 Clean Power Quarterly Report for detailed state-by-state analysis, technology deep-dives, and comprehensive market data.

  • 欧美情色片 members:听Download the report and appendices at the buttons above.
  • Summary version available to all: Download a free summary

 

Resource added 6/2/2026

Members Only