Clean Power Decommissioning

Clean power projects are decommissioned at end of life through planned equipment removal, site restoration, and recycling鈥攁t no cost to landowners.

Clean Power Decommissioning

Clean power projects鈥攕uch as wind, solar, and energy storage鈥攁re designed with a clear end鈥憃f鈥憀ife plan from the start. Developers are required to remove equipment and restore the land once a project reaches the end of its operational life, a process known as decommissioning. These plans are created during permitting and ensure landowners and host communities are never responsible for cleanup costs.

Decommissioning includes removing infrastructure, restoring the site to a usable condition, and responsibly managing materials. Most project components can be recycled or reused, significantly reducing waste and costs. Financial assurances are put in place over the life of a project to guarantee decommissioning obligations are fully covered, providing long鈥憈erm certainty for communities and landowners.

Key takeaways on clean power decomissioning:

  • Decommissioning plans are required during project permitting or before construction begins
  • Developers鈥攏ot landowners or communities鈥攑ay all decommissioning costs
  • Financial assurance is posted over time to cover removal and land restoration
  • Sites are restored to a condition similar to pre鈥慶onstruction use
  • 80鈥�95% of wind, solar, and battery storage materials can be recycled
  • Projects may also be repowered with newer technology instead of being fully removed

 